How To Construct Coated Bottom Wall Cloth And Non-woven Bottom Wall Cloth?

Mar 11, 2022

One of the coated bottom wall, one of the seamless wall, the back of the wall, made the coating process, so that the wall cloth avoids the lease during the construction process, avoiding the seepage of wall stains.

Non-woven bottom wall cloth

The non-woven bottom wall is the mainstream class of seamless wall, the surface layer is a textile fabric, and the bottom layer is a nonwoven fabric, the surface layer and the underlying composite becomes a non-woven bottom wall.


Coating bottom wall construction


Before construction, the characteristics of the coating base wall cloth must be understood. This type of wall is generally non-breathable, so it is required to adjust the gelatin to be thin, and the brush is necessary, don't be too thick, avoid the rubber layer difficult to dry, causing mold; the coating is not easy to leverage, the coating wall brunette is relatively Stable, the cropping effect is better.


The construction of the coated bottom seamless wall is the focus is the wall treatment before paste, which requires strict control, which is a place that many masters are easy to ignore. After the wall is treated and the wall-based film is applied, the paste process is as follows.

1. Brush the glue on the wall.


2. Putting cloth and positioning. You can operate one person, and the cloth is gradually pasted. But more are two people working, one is put, and one is pasted.


3. Treatment of the yin and yang, doors and windows, switches and shapes.


4. The brush and blade are used in combination with a brush, and the corner can be used with a blade.

Non-woven bottom wall construction

Non-woven bottom wall construction


The non-woven bottom seamless wall construction and coating bottom seamless wall fabrics are basically the same, but the requirements for rubber and brush glue are more stringent, and they must be concentrated, uniform, especially the modular corners and edge positions. Controlled. The specific paste process is as follows.


1. Wall detection and treatment: front wall inspection and processing in place, brush wall base film. The walls of the wall must be guaranteed to be flat, dry, sturdy, no dirt, pH moderate. If it does not meet the above conditions, the wall cloth is prone to malic modes, tightening, and painted adverse symptoms.


2, rubber and brush: adjust the glue based on the wall of the wall to be passed. Brush glue on the wall. It is required to be coated, no brush, and determine the thickness of the brush glue according to the wall cloth characteristics, generally not suitable for brushing.


3, hook: hook and cut out the position of doors and windows.


4, paste: Paste the wall, do a good cool, make a shape.


5, self-test: observation at 1.5M. Requires no color difference under natural light, no stain, bubble.


6. Acceptance: Please accept the owner to accept and notify the precautions.


The room should be properly ventilated within a week after the completion of the construction, and air conditioning is not used. Strictly prevent doors and windows, water, seepage. No hard objects are scratched, hit.